Morris Vermaport had the task to replace two very unreliable hydraulic lifts with state of the art Ecocell Traction lifts over the period the students were on summer break, a tall order but all was complete with 3 days to spare. both in the same building on different ends 100 meters apart. The lifts are located in the recently completed Art, design and Technology centre.
Below are a series of images from the rip out of the old hydraulic lift through various stages of the install.
STAGE 1 : THE RIP OUT
STAGE 2 : INSTALL BEGINS
STAGE 3 :
STAGE 4 :