3rd and the final lift installation is now complete in the Maternity Unit of the City Hospital in Nottingham. This was a huge project with all 3 lifts needing their own reinforced structure to operate within since the surrounding walls were deemed unfit to support the weight needed for 2 large bed lifts which both have a 3.5-ton capacity. fully lined out with a custom design control panel and lighting along with ultra-hygienic lift car lineout to ease cleaning.