Get In Touch

Get In Touch

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Contact Page

Lift Installation Nottingham University

Nottingham, United Kingdom

Lift Installation Nottingham Trent University using MV Lifts exclusive Ecocell® evacuation lift. Morris Vermaport is the only supplier worldwide of this unique product. Utilising its Battery Back up system this evacuation lift allows approx 120 floor-to-floor runs during a power outage, it can also prioritise its use for those with disabilities or using a wheelchair using a key fob to gain access during an emergency situation.

The Lift Installation was in the Nottingham Trent University Chaucer Building, the home of the Nottingham Law School.

The Ecocell is designed to reduce energy consumption and to provide an “integrated stand-by power supply” for evacuation and power loss situations. An Ecocell can be fitted as a new lift, or a replacement lift.